Capacity: 4.390 MW
Status: Operational
This is our second community solar farm. As with our other sites (commercial and community), there is almost no visibility from public roads or other public rights of way, and land grade is low, of course. After a Point of Connection offer was received from the local electricity company, Western Power, and planning permission was granted, construction, commissioning and 'grid' connection concluded in June 2016. The solar farm has been operational since then, meaning it generates benefits for its charity over its lifetime. Sheep grazing continues during operation of the solar farm.
© 2019-2022 Hadstone Energy. All rights reserved.