YARDWALL MANOR

Yardwall Manor Solar Farm

Capacity: 3 MW

Status: Operational

The solar farm produces 2.5 million hours of renewable electricity. The site was selected as the landscape is very low lying, and there is limited visibility. Land grade is low. Planning permission was granted in September 2014, and construction took place in Spring 2015. The solar farm is operational.

© 2019-2022 Hadstone Energy. All rights reserved.

Yardwall Manor Solar Farm